GOVERNMENT OF PUDUCHERRY ELECTRICITY DEPARTMENT ~~ ** ~~ APPLICATION FOR ISSUE OF POWER FEASIBILITY CERTIFICATE 1. Name of the firm with Registration number, if any : 2. Address for correspondence : 3. Location of the Plant with Village name / Survey number and sketch showing the location of the industry with approach road : 4. Power Demand in KVA : 5. Power Demand in KW : 6. Total connected load in H.P. : 7. Product/Products and Byproducts manufactured : 8. Brief description of manufacture/fabrication in the industry and the role of electrical power unit : 9. Capacity of the Plant per day/month/annum : 10. Whether power is required in stages or wholly : 11. What are future power requirements upto next 5/10 years : .2 2 12. Details of major electrical installations This should be furnished for each equipment 1. Rated output : 2. Rated voltage : 3. Rated full load current : 4. Rated power factor : 5. Single phase or three phase : 6. Nature of load, whether inductive/resistive : 7. Method of starting : 13. Details of protection against faults (whether applicable) : 1. Overloading : 2. Short circuit : 3. Ground faults : 14. What are measures taken for improvement of power factor (brief description should be furnished) : 15. What are the type of Switchgears involved in making/breaking load currents : 16. Probable date of availing power supply : 17. Any other details : Place : Date : SIGNATURE OF THE APPLICANT